Dataset Viewer
Auto-converted to Parquet Duplicate
id
stringlengths
64
64
state_id
stringlengths
64
64
family_id
stringclasses
1 value
state
stringlengths
3k
5.21k
gold_label_kind
stringclasses
1 value
split
stringclasses
1 value
native_split
stringclasses
1 value
questions_json
stringlengths
276
1.13k
gold_json
stringclasses
12 values
metadata_json
stringlengths
1.29k
1.98k
0576d0e44402f5fea6de86c2d9904751628b6c5f05e8c3c350d99912bc654311
ee8ba0a8f9c866fcefc199ce8d5ab8fb843ef857026e236bc40ee9fe4cff81c9
ra2-normal-staged-decision
Decision stage 1 at tick 0. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation abando...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c...
{"next_action":"C"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
737a9525b7fb76be7b91c66fc2b9c4c1935da8ee6ae65d137f3590a1a7a2c862
401dbc7c19175996b087cac3b6b21c041c6819e16d62a06a9c70260a689bfed7
ra2-normal-staged-decision
Decision stage 1 at tick 3. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation abando...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
6140892e5b9fdb0a094c159d0c8e45516c0aceeca3c9142f0f0a171a290d4e34
04f67ffea3f2f473fe5f563e5c13c44d1036254ea56f3c8cf8374084b351bd91
ra2-normal-staged-decision
Decision stage 1 at tick 6. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation abando...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
557cbbfb5654fcf5bdadb02b89f8efddf3497198938b7cf6d00ba0f2d0aacc99
4fbc11107ddd70705dd53fc30a5801055cd0c11c9c3b041eb7318b1b112a5a5b
ra2-normal-staged-decision
Decision stage 1 at tick 9. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation abando...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
f55a9da57b22410c7fa4352326ea3ed5226f36ef3d1df7fb32a13d12aed903ad
bea3d19f8e7758395b1c8abb7557f6fea3a45aa485c1864810a7ee8e958eb54f
ra2-normal-staged-decision
Decision stage 1 at tick 12. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
994217c2df5f9289fc496119aa0bb936899a10119da727dd1149a5df5ef1fb61
2e564e45e66c49cf03188292507eed08d274c6bc71e0e92d06c4c3ddbc413022
ra2-normal-staged-decision
Decision stage 1 at tick 15. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
205bdcede325bfbe9244e1ffe1f32d5c8579a0c1f13a9e1baf5cfc64e40abcef
51243cfc849e69afae99650fee17413dcfbb17bb7bc0767a556dd7e8e9d3c539
ra2-normal-staged-decision
Decision stage 1 at tick 18. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
748faac33efcb7bb2b0db294d5f9d42ad07bcc7de1605029a2f8ed8c5081947b
0af4dbe714f687e387cbe9e808b3e4e6d55fd4af464bb76cc2195a3a59f3504d
ra2-normal-staged-decision
Decision stage 1 at tick 21. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
f9d8094527754c1da11575ca5ef59e7ab8dfedafc341f76ca1399fb741f07404
c1275ae3c1904237343383bacbfdbedb17f8ee1748eb86b3af75f95332d14cc0
ra2-normal-staged-decision
Decision stage 1 at tick 24. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
df358a487df835b6e2575f1889d97d994b6b2ce4c8201b11967e830a56a7b518
27dd5210d645ad568b35ac9190cf986bbe588dd4d4552c3983de5062c784e1a9
ra2-normal-staged-decision
Decision stage 1 at tick 27. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"B"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
7ee1f6ca1037e1353b747c65d60e0843f9b0cc74596a9b6c6988957198794c90
2bf835775a5c69164abd4f87f715c7aaa31f3a64c7d058dc2e3b39c77a5fa3cb
ra2-normal-staged-decision
Decision stage 1 at tick 30. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
0574fc567494d97435dfd82d621cf81d123e402ac59bd1bef819c73dab6b0e80
d7ef68a84c0ed865df6595a282ec955b7f6e44a5dc0e3ae84a8a1a131191206b
ra2-normal-staged-decision
Decision stage 1 at tick 33. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
9d47276fd02d3175875c437fdf92a41c4c31ad1ea5c889a7e4664c8b35ddf4a5
c25a48520f889dfc4e213dd9ff92aaf6ae6f4a247ef1a9f646fdc432e4ae657b
ra2-normal-staged-decision
Decision stage 1 at tick 36. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
f5e4b69d45fbe4ad82c21c8c63fd178cddf1c63d389c58e1a5fe9b9cc63f256b
9ab2d2d612d5ba359a5c3a63640945d8b1c4913568f6e22a0a3a11f246696c63
ra2-normal-staged-decision
Decision stage 1 at tick 39. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
2fd84a514f595924af4ff9201a5ad917f96962b26f2e4100cc632302ff80e4ec
bc6e8ef6d2110265ff22513965e03f0adecbfd10d4d2a1fe74234cbc1d907e0d
ra2-normal-staged-decision
Decision stage 1 at tick 42. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
2d53bf73880e6fd3d0b53774dd5c960428b684bd92dbdd8b71b86c15eb34e7b0
3c1986601f8ad5ebce4d323eef0e82a39057ea00c2e87faa8314f198c33d4b35
ra2-normal-staged-decision
Decision stage 1 at tick 45. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
bec8bfc45dd1db6957c78d75eeaadbb6bfe15a1f17e56748d476af5a42ef484c
80f0c324fd0ef1b00acae939e183209f6b71b318657724ca8696be6de506f5b7
ra2-normal-staged-decision
Decision stage 1 at tick 48. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
630170a42410f26252f8a26a78bb9bfdf588d536c289e6ac5ec06d4d496ccb21
77b49e7d25828b305606f3d55a25def9de4cbe1f71f66e2d7f4adfc993d421a0
ra2-normal-staged-decision
Decision stage 1 at tick 51. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
645a7e99c73c726adfe42408226bf6f220c7a150505edbe54ded0d0c5d9b116e
7a77c768b623c2e2a631bf0cec13215b68bb2248b0bc3b4ba62adc03cd224252
ra2-normal-staged-decision
Decision stage 1 at tick 54. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
88cbaac5a3873cc7c13773aab9d2111fc0e6321b486038eec8d5ed1e4370c68f
94e560edff983a52454bdf585c5dda1db2cd42930268ba6a371c2aae763e12da
ra2-normal-staged-decision
Decision stage 1 at tick 57. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
ebe326175c4154d089ad6aff825304dd6c0b0bbf0643cbd432e3c4bd5b627203
59f345ca5618859b4f8e40d296908de3e858d4b9d48528a8b137b32f479841ed
ra2-normal-staged-decision
Decision stage 1 at tick 60. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
ea86de79d5c6578897feb1e2f71b3f76c6bb6b222b4cd9e10c7264dd991a1202
ed0bffbc6636bc4b6472001f79ffbae67922407c1d67d6f1280add78a9996806
ra2-normal-staged-decision
Decision stage 1 at tick 63. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
02faf4de020df7acde83e9245b71e46330a0e01af32ad8d8974a519d67137721
3ed9a7f86958224a2d9968e24c8b539dc19d51674424786c624b8ac30cd051af
ra2-normal-staged-decision
Decision stage 1 at tick 66. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
26bdb4517a724f7075a8ced129f753c96be1252c5115bf07a9008db5cac6b9f7
b729f48dcb59ff854683e1b4654a594cb4675aeba448ac24f6d38139e4df255a
ra2-normal-staged-decision
Decision stage 1 at tick 69. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
d23c6259574fca92398bced0c89e2e198c73e966d26f290fe0e6b98c3d3d6c5c
6ca903e47460cef1bbe0098c0d2ef81eef37d1ec0805357142aaa74a6663c95d
ra2-normal-staged-decision
Decision stage 1 at tick 72. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
c2a49f9d4208422a6b2c23d451151802faaa2ebafd62a5c6665343539e60f00c
e0bc62789a1d3573d5a11420bbdd60662d5ee2ab0c3aa623ee38b7828f423dc7
ra2-normal-staged-decision
Decision stage 1 at tick 75. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
e841473d982bbb752cb5166b02d2ba213f36c24dae8013b12c38602cb18588ab
4fd0b0bacc2f7b3bf74d9b146a6606b0f0ceb445988442656d894a7af94fd57e
ra2-normal-staged-decision
Decision stage 1 at tick 78. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
7e9db062ace932f60fde1c5b60ce3d4851149f7087336c09b5fbc2a22731f5ea
9fd1ddbf4380c339e4bd85f16e77841953eb0b129cb23bb733d6fdc4d452313c
ra2-normal-staged-decision
Decision stage 1 at tick 81. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
8048ddacb659f79d031b37946d3711737ef32c9b371819ff1ef0df4b4c42f178
db02817d8f65430e88dd47dc1ac58b70a2a38919bea795689cf3a28fac40b060
ra2-normal-staged-decision
Decision stage 1 at tick 84. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
66bd0795d2f75176608909585041afd13073fcec4dd61a3e4493345dafdbc0e0
7f6f51722d39c7603e2d89badb4904a64806378aa7e37eadfc65a9f3bb016ec9
ra2-normal-staged-decision
Decision stage 1 at tick 87. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
6fc7d4b2e818de29f8fb50cecae3b8cd3c9e936fbb9fc21dcb1386c5f04e6ed0
8069133ca9c24791cb178fe5aef61e3b891a9d94262889488d6321f2cad1a08e
ra2-normal-staged-decision
Decision stage 1 at tick 90. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
68a2a23d97fbe4ff779571a88e3a49fb66edb57257819b2d8b32cb7a0ce0d64d
e6b76aa1fc11eb4f68b387a38baaa340f6faea3c1774785d2b7232d0d6ce977b
ra2-normal-staged-decision
Decision stage 1 at tick 93. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
e714731a9ce668ee57afb134ceb4044a8981f528e0a2b07a79810241f70f0b73
2880e76150d8eb7aaecc1140b92db8d340f4951bdfd46e4a9abb16fb0a14cd7f
ra2-normal-staged-decision
Decision stage 1 at tick 96. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
900240b1678439bb7075e4b7c2677923c3556ce22f324949d1635c114508dc8b
acf354d7d8944f656ef63608fb4d516d8e5ec1caa13bc22658e870b966803f56
ra2-normal-staged-decision
Decision stage 1 at tick 99. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
d8cbde1deb77a9c53a2961dbc28abd6009c1a85b8de4198fd59ce24cbbc0a6de
004b47711862f0d120835fe2a2c9b2f964f6e3a17ac6a18c43af435952304219
ra2-normal-staged-decision
Decision stage 1 at tick 102. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet. Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aban...
hard_gold_unspecified
train
train
{"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte...
{"next_action":"A"}
{"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202...
End of preview. Expand in Data Studio

Red Alert 2 — NanoJev SFT

This dataset contains the native v65 supervision used for the NanoJev SFT run in the Red Alert 2 demo. Labels come from heuristic teacher demonstrations and DAgger corrections. The inputs use normal fog-of-war observations. The starting model is C-Tianyu/NanoJev at revision 047b927b30882a1138fc504821b82ac145a4b81a.

Splits

Split Examples
train 16,138
validation 1,461

Load the data

import json
from datasets import load_dataset

ds = load_dataset("jayzou3773/ra2-nanojev-sft")
row = ds["train"][0]
questions = json.loads(row["questions_json"])

state contains the exact native input text. questions_json, gold_json, and metadata_json contain JSON strings. Parse them with json.loads. The metadata contains the source, token audit, and native input hash. native_split preserves the original train/dev label.

The fixed-schema JSONL files support dataset tools with static column schemas. Nested objects are stored as JSON strings to preserve dynamic question and option keys. Original native files remain available separately.

Source and checks

original/train.jsonl and original/dev.jsonl are the exact files used by the training script. Their bytes and SHA-256 hashes are unchanged. dev means classifier validation from training-protocol data. It does not mean engine development matches. The original manifest starts from 21,747 raw rows. It removes 3,597 duplicate native inputs and 551 validation inputs found in training. The export has 16,138 training examples and 1,461 validation examples. The native input hashes are disjoint across splits. The original manifest hash is 52798898b238e1fb940a6a786b48ab4fa7fa897e1b823caecc8547c96e572329.

Read verification.json for the checks made for this release. SHA256SUMS covers every released file except the checksum file itself.

Scope

These are supervised decision labels. They are not human conversation data or model-generated answers. They use the ra2-game-env simulation. They do not represent Windows client recordings or native Chrono Divide replay files. No evaluation matches or sealed-test matches are included in the training splits.

Classifier validation measures label prediction. It is not a game win-rate test. This release contains data and source metadata. It does not contain model weights or game assets.

No new data license is assigned by this upload. Public access does not change any applicable source rights.

Downloads last month
44

Models trained or fine-tuned on jayzou3773/ra2-nanojev-sft