Datasets:
id stringlengths 64 64 | state_id stringlengths 64 64 | family_id stringclasses 1
value | state stringlengths 3k 5.21k | gold_label_kind stringclasses 1
value | split stringclasses 1
value | native_split stringclasses 1
value | questions_json stringlengths 276 1.13k | gold_json stringclasses 12
values | metadata_json stringlengths 1.29k 1.98k |
|---|---|---|---|---|---|---|---|---|---|
0576d0e44402f5fea6de86c2d9904751628b6c5f05e8c3c350d99912bc654311 | ee8ba0a8f9c866fcefc199ce8d5ab8fb843ef857026e236bc40ee9fe4cff81c9 | ra2-normal-staged-decision | Decision stage 1 at tick 0. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation abando... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c... | {"next_action":"C"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
737a9525b7fb76be7b91c66fc2b9c4c1935da8ee6ae65d137f3590a1a7a2c862 | 401dbc7c19175996b087cac3b6b21c041c6819e16d62a06a9c70260a689bfed7 | ra2-normal-staged-decision | Decision stage 1 at tick 3. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation abando... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
6140892e5b9fdb0a094c159d0c8e45516c0aceeca3c9142f0f0a171a290d4e34 | 04f67ffea3f2f473fe5f563e5c13c44d1036254ea56f3c8cf8374084b351bd91 | ra2-normal-staged-decision | Decision stage 1 at tick 6. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation abando... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
557cbbfb5654fcf5bdadb02b89f8efddf3497198938b7cf6d00ba0f2d0aacc99 | 4fbc11107ddd70705dd53fc30a5801055cd0c11c9c3b041eb7318b1b112a5a5b | ra2-normal-staged-decision | Decision stage 1 at tick 9. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation abando... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
f55a9da57b22410c7fa4352326ea3ed5226f36ef3d1df7fb32a13d12aed903ad | bea3d19f8e7758395b1c8abb7557f6fea3a45aa485c1864810a7ee8e958eb54f | ra2-normal-staged-decision | Decision stage 1 at tick 12. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
994217c2df5f9289fc496119aa0bb936899a10119da727dd1149a5df5ef1fb61 | 2e564e45e66c49cf03188292507eed08d274c6bc71e0e92d06c4c3ddbc413022 | ra2-normal-staged-decision | Decision stage 1 at tick 15. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
205bdcede325bfbe9244e1ffe1f32d5c8579a0c1f13a9e1baf5cfc64e40abcef | 51243cfc849e69afae99650fee17413dcfbb17bb7bc0767a556dd7e8e9d3c539 | ra2-normal-staged-decision | Decision stage 1 at tick 18. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
748faac33efcb7bb2b0db294d5f9d42ad07bcc7de1605029a2f8ed8c5081947b | 0af4dbe714f687e387cbe9e808b3e4e6d55fd4af464bb76cc2195a3a59f3504d | ra2-normal-staged-decision | Decision stage 1 at tick 21. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
f9d8094527754c1da11575ca5ef59e7ab8dfedafc341f76ca1399fb741f07404 | c1275ae3c1904237343383bacbfdbedb17f8ee1748eb86b3af75f95332d14cc0 | ra2-normal-staged-decision | Decision stage 1 at tick 24. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait 0.2 seconds; build no army or new buildings","B":"Move or c... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
df358a487df835b6e2575f1889d97d994b6b2ce4c8201b11967e830a56a7b518 | 27dd5210d645ad568b35ac9190cf986bbe588dd4d4552c3983de5062c784e1a9 | ra2-normal-staged-decision | Decision stage 1 at tick 27. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"B"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
7ee1f6ca1037e1353b747c65d60e0843f9b0cc74596a9b6c6988957198794c90 | 2bf835775a5c69164abd4f87f715c7aaa31f3a64c7d058dc2e3b39c77a5fa3cb | ra2-normal-staged-decision | Decision stage 1 at tick 30. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
0574fc567494d97435dfd82d621cf81d123e402ac59bd1bef819c73dab6b0e80 | d7ef68a84c0ed865df6595a282ec955b7f6e44a5dc0e3ae84a8a1a131191206b | ra2-normal-staged-decision | Decision stage 1 at tick 33. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
9d47276fd02d3175875c437fdf92a41c4c31ad1ea5c889a7e4664c8b35ddf4a5 | c25a48520f889dfc4e213dd9ff92aaf6ae6f4a247ef1a9f646fdc432e4ae657b | ra2-normal-staged-decision | Decision stage 1 at tick 36. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
f5e4b69d45fbe4ad82c21c8c63fd178cddf1c63d389c58e1a5fe9b9cc63f256b | 9ab2d2d612d5ba359a5c3a63640945d8b1c4913568f6e22a0a3a11f246696c63 | ra2-normal-staged-decision | Decision stage 1 at tick 39. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
2fd84a514f595924af4ff9201a5ad917f96962b26f2e4100cc632302ff80e4ec | bc6e8ef6d2110265ff22513965e03f0adecbfd10d4d2a1fe74234cbc1d907e0d | ra2-normal-staged-decision | Decision stage 1 at tick 42. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
2d53bf73880e6fd3d0b53774dd5c960428b684bd92dbdd8b71b86c15eb34e7b0 | 3c1986601f8ad5ebce4d323eef0e82a39057ea00c2e87faa8314f198c33d4b35 | ra2-normal-staged-decision | Decision stage 1 at tick 45. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
bec8bfc45dd1db6957c78d75eeaadbb6bfe15a1f17e56748d476af5a42ef484c | 80f0c324fd0ef1b00acae939e183209f6b71b318657724ca8696be6de506f5b7 | ra2-normal-staged-decision | Decision stage 1 at tick 48. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
630170a42410f26252f8a26a78bb9bfdf588d536c289e6ac5ec06d4d496ccb21 | 77b49e7d25828b305606f3d55a25def9de4cbe1f71f66e2d7f4adfc993d421a0 | ra2-normal-staged-decision | Decision stage 1 at tick 51. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
645a7e99c73c726adfe42408226bf6f220c7a150505edbe54ded0d0c5d9b116e | 7a77c768b623c2e2a631bf0cec13215b68bb2248b0bc3b4ba62adc03cd224252 | ra2-normal-staged-decision | Decision stage 1 at tick 54. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
88cbaac5a3873cc7c13773aab9d2111fc0e6321b486038eec8d5ed1e4370c68f | 94e560edff983a52454bdf585c5dda1db2cd42930268ba6a371c2aae763e12da | ra2-normal-staged-decision | Decision stage 1 at tick 57. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
ebe326175c4154d089ad6aff825304dd6c0b0bbf0643cbd432e3c4bd5b627203 | 59f345ca5618859b4f8e40d296908de3e858d4b9d48528a8b137b32f479841ed | ra2-normal-staged-decision | Decision stage 1 at tick 60. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
ea86de79d5c6578897feb1e2f71b3f76c6bb6b222b4cd9e10c7264dd991a1202 | ed0bffbc6636bc4b6472001f79ffbae67922407c1d67d6f1280add78a9996806 | ra2-normal-staged-decision | Decision stage 1 at tick 63. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
02faf4de020df7acde83e9245b71e46330a0e01af32ad8d8974a519d67137721 | 3ed9a7f86958224a2d9968e24c8b539dc19d51674424786c624b8ac30cd051af | ra2-normal-staged-decision | Decision stage 1 at tick 66. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
26bdb4517a724f7075a8ced129f753c96be1252c5115bf07a9008db5cac6b9f7 | b729f48dcb59ff854683e1b4654a594cb4675aeba448ac24f6d38139e4df255a | ra2-normal-staged-decision | Decision stage 1 at tick 69. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
d23c6259574fca92398bced0c89e2e198c73e966d26f290fe0e6b98c3d3d6c5c | 6ca903e47460cef1bbe0098c0d2ef81eef37d1ec0805357142aaa74a6663c95d | ra2-normal-staged-decision | Decision stage 1 at tick 72. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
c2a49f9d4208422a6b2c23d451151802faaa2ebafd62a5c6665343539e60f00c | e0bc62789a1d3573d5a11420bbdd60662d5ee2ab0c3aa623ee38b7828f423dc7 | ra2-normal-staged-decision | Decision stage 1 at tick 75. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
e841473d982bbb752cb5166b02d2ba213f36c24dae8013b12c38602cb18588ab | 4fd0b0bacc2f7b3bf74d9b146a6606b0f0ceb445988442656d894a7af94fd57e | ra2-normal-staged-decision | Decision stage 1 at tick 78. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Wait for the placed construction yard to finish construction","B... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
7e9db062ace932f60fde1c5b60ce3d4851149f7087336c09b5fbc2a22731f5ea | 9fd1ddbf4380c339e4bd85f16e77841953eb0b129cb23bb733d6fdc4d452313c | ra2-normal-staged-decision | Decision stage 1 at tick 81. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
8048ddacb659f79d031b37946d3711737ef32c9b371819ff1ef0df4b4c42f178 | db02817d8f65430e88dd47dc1ac58b70a2a38919bea795689cf3a28fac40b060 | ra2-normal-staged-decision | Decision stage 1 at tick 84. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
66bd0795d2f75176608909585041afd13073fcec4dd61a3e4493345dafdbc0e0 | 7f6f51722d39c7603e2d89badb4904a64806378aa7e37eadfc65a9f3bb016ec9 | ra2-normal-staged-decision | Decision stage 1 at tick 87. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
6fc7d4b2e818de29f8fb50cecae3b8cd3c9e936fbb9fc21dcb1386c5f04e6ed0 | 8069133ca9c24791cb178fe5aef61e3b891a9d94262889488d6321f2cad1a08e | ra2-normal-staged-decision | Decision stage 1 at tick 90. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
68a2a23d97fbe4ff779571a88e3a49fb66edb57257819b2d8b32cb7a0ce0d64d | e6b76aa1fc11eb4f68b387a38baaa340f6faea3c1774785d2b7232d0d6ce977b | ra2-normal-staged-decision | Decision stage 1 at tick 93. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
e714731a9ce668ee57afb134ceb4044a8981f528e0a2b07a79810241f70f0b73 | 2880e76150d8eb7aaecc1140b92db8d340f4951bdfd46e4a9abb16fb0a14cd7f | ra2-normal-staged-decision | Decision stage 1 at tick 96. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
900240b1678439bb7075e4b7c2677923c3556ce22f324949d1635c114508dc8b | acf354d7d8944f656ef63608fb4d516d8e5ec1caa13bc22658e870b966803f56 | ra2-normal-staged-decision | Decision stage 1 at tick 99. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aband... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
d8cbde1deb77a9c53a2961dbc28abd6009c1a85b8de4198fd59ce24cbbc0a6de | 004b47711862f0d120835fe2a2c9b2f964f6e3a17ac6a18c43af435952304219 | ra2-normal-staged-decision | Decision stage 1 at tick 102. The simulation is paused at this same tick. No choices in this decision have been submitted or executed yet.
Previous choices above are commitments for this decision, not observations of completed actions. Keep their bound parameters. Choose the remaining parameters only; cancellation aban... | hard_gold_unspecified | train | train | {"next_action":{"type":"choice","instructions":"Choose the next action that advances your strategic objective. Keep useful processes running and protect the means to win. Select the action first; unresolved parameters will be asked next.","criteria":{"A":"Continue power plant production and existing orders without inte... | {"next_action":"A"} | {"labelMeaning":"Heuristic expert's chosen action; not deterministic truth, observed reward, or a model probability","source_group_id":"5386339100648f21e4e0719b580a79be43975590e3a25fa0a7dfd679ea8e4506","sourcePath":"/raid/x9zou/jev4ra/research/llm-honing-integration-pr/examples/ra2/runs/teacher-v39-target-alignment-202... |
Red Alert 2 — NanoJev SFT
This dataset contains the native v65 supervision used for the NanoJev SFT run in the Red Alert 2 demo. Labels come from heuristic teacher demonstrations and DAgger corrections. The inputs use normal fog-of-war observations. The starting model is C-Tianyu/NanoJev at revision 047b927b30882a1138fc504821b82ac145a4b81a.
Splits
| Split | Examples |
|---|---|
| train | 16,138 |
| validation | 1,461 |
Load the data
import json
from datasets import load_dataset
ds = load_dataset("jayzou3773/ra2-nanojev-sft")
row = ds["train"][0]
questions = json.loads(row["questions_json"])
state contains the exact native input text. questions_json, gold_json, and metadata_json contain JSON strings. Parse them with json.loads. The metadata contains the source, token audit, and native input hash. native_split preserves the original train/dev label.
The fixed-schema JSONL files support dataset tools with static column schemas. Nested objects are stored as JSON strings to preserve dynamic question and option keys. Original native files remain available separately.
Source and checks
original/train.jsonl and original/dev.jsonl are the exact files used by the training script. Their bytes and SHA-256 hashes are unchanged. dev means classifier validation from training-protocol data. It does not mean engine development matches. The original manifest starts from 21,747 raw rows. It removes 3,597 duplicate native inputs and 551 validation inputs found in training. The export has 16,138 training examples and 1,461 validation examples. The native input hashes are disjoint across splits. The original manifest hash is 52798898b238e1fb940a6a786b48ab4fa7fa897e1b823caecc8547c96e572329.
Read verification.json for the checks made for this release. SHA256SUMS covers every released file except the checksum file itself.
Scope
These are supervised decision labels. They are not human conversation data or model-generated answers. They use the ra2-game-env simulation. They do not represent Windows client recordings or native Chrono Divide replay files. No evaluation matches or sealed-test matches are included in the training splits.
Classifier validation measures label prediction. It is not a game win-rate test. This release contains data and source metadata. It does not contain model weights or game assets.
No new data license is assigned by this upload. Public access does not change any applicable source rights.
- Downloads last month
- 44